<html xmlns:v="urn:schemas-microsoft-com:vml" xmlns:o="urn:schemas-microsoft-com:office:office" xmlns:w="urn:schemas-microsoft-com:office:word" xmlns:m="http://schemas.microsoft.com/office/2004/12/omml" xmlns="http://www.w3.org/TR/REC-html40"><head><META HTTP-EQUIV="Content-Type" CONTENT="text/html; charset=us-ascii"><meta name=Generator content="Microsoft Word 12 (filtered medium)"><!--[if !mso]><style>v\:* {behavior:url(#default#VML);}
o\:* {behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape {behavior:url(#default#VML);}
</style><![endif]--><style><!--
/* Font Definitions */
@font-face
        {font-family:"Cambria Math";
        panose-1:2 4 5 3 5 4 6 3 2 4;}
@font-face
        {font-family:Calibri;
        panose-1:2 15 5 2 2 2 4 3 2 4;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
        {margin:0in;
        margin-bottom:.0001pt;
        font-size:12.0pt;
        font-family:"Times New Roman","serif";}
h3
        {mso-style-priority:9;
        mso-style-link:"Heading 3 Char";
        mso-margin-top-alt:auto;
        margin-right:0in;
        mso-margin-bottom-alt:auto;
        margin-left:0in;
        font-size:13.5pt;
        font-family:"Times New Roman","serif";
        font-weight:bold;}
a:link, span.MsoHyperlink
        {mso-style-priority:99;
        color:blue;
        text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
        {mso-style-priority:99;
        color:purple;
        text-decoration:underline;}
p
        {mso-style-priority:99;
        mso-margin-top-alt:auto;
        margin-right:0in;
        mso-margin-bottom-alt:auto;
        margin-left:0in;
        font-size:12.0pt;
        font-family:"Times New Roman","serif";}
span.EmailStyle17
        {mso-style-type:personal-compose;
        font-family:"Calibri","sans-serif";
        color:windowtext;}
span.Heading3Char
        {mso-style-name:"Heading 3 Char";
        mso-style-priority:9;
        mso-style-link:"Heading 3";
        font-family:"Times New Roman","serif";
        font-weight:bold;}
span.headline
        {mso-style-name:headline;}
span.normal
        {mso-style-name:normal;}
.MsoChpDefault
        {mso-style-type:export-only;}
@page WordSection1
        {size:8.5in 11.0in;
        margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
        {page:WordSection1;}
--></style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext="edit" spidmax="1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext="edit">
<o:idmap v:ext="edit" data="1" />
</o:shapelayout></xml><![endif]--></head><body lang=EN-US link=blue vlink=purple><div class=WordSection1><p class=MsoNormal>Information from Commissioner Bill Ganz.<o:p></o:p></p><p class=MsoNormal>Denise Bogner<o:p></o:p></p><div class=MsoNormal align=center style='text-align:center'><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'><hr size=2 width="100%" align=center></span></div><p class=MsoNormal><span class=headline><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>FDOT Traffic Impacts to Remain Until June 26th </span></span><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'><o:p></o:p></span></p><div class=MsoNormal align=center style='text-align:center'><span class=headline><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'><hr size=2 width="100%" align=center></span></span></div><h3><span class=normal><span style='font-family:"Arial","sans-serif";color:#333333'>Hello Neighbors, </span></span><o:p></o:p></h3><h3><span style='font-family:"Arial","sans-serif";color:#333333'>Please be aware of the following work that will take place between June 19th and June 26th. We thank you for your patience as FDOT completes these important upgrades to our roadways.<o:p></o:p></span></h3><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>I-95 Interchange from Hillsboro Boulevard to SW 10th Street<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>Traffic Impact:<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>• Up to three southbound outside lanes of I-95 between Hillsboro Boulevard and SW 10th Street may be closed Sunday through Friday, with the first lane closing at 9 p.m., the second lane closing at 10 p.m. and the third lane, if needed, closing at 12:30 a.m. until 5 a.m.<br>• I-95 southbound exit ramp to SW 10th Street will be fully closed Sunday through Friday between 9 p.m. and 5 a.m. Traffic will be detoured via Hillsboro Boulevard. (See attached flyer)<br>• Two westbound lanes of SW 10th Street west of I-95 will be closed intermittently Monday through Friday between 9 p.m. and 5 a.m. for a traffic shift.<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>Description: This project consists of widening southbound I-95 to add an auxiliary lane from the Hillsboro Boulevard entrance ramp to the SW 10th Street exit ramp, widening the existing southbound I-95 exit ramp to SW 10th Street, addition of a free flow right turn lane to westbound SW 10th Street, widening of westbound SW 10th Street to add an acceleration lane, utility relocation, milling and resurfacing, bridge widening, installation of barrier walls, curbs, sidewalks, guardrail, drainage, overhead signs, signing and pavement markings, signals, lighting, and retaining walls. This is the first of five interchange improvement projects throughout Broward and Palm Beach Counties. <o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>Cost/Completion: Construction cost for all five projects is $32.5 million. Completion in summer 2017. <o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>Hillsboro Boulevard from west of Natura Boulevard to west of Dixie Highway in Deerfield Beach<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>Traffic Impact:<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>• One lane in each direction of Hillsboro Boulevard from west of Natura Boulevard to west of Dixie Highway will be closed Monday through Friday between 9 a.m. and 4 p.m.<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>Description: Project improvements include installing new decorative lighting along Hillsboro Boulevard within the project limits, installing countdown timers at the pedestrian crossings at Natura Boulevard and NW 3rd Avenue, installing a new mast arm signal at NW 2nd Avenue, and removing old asphalt and resurfacing the roadway.<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>Cost/Completion: $831,515.39. Completion in fall 2015.<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>Powerline Road Improvements in Deerfield Beach<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>Traffic Impact:<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>• One lane in each direction of Powerline Road from north of West Drive to the Palm Beach County line will be closed Monday through Friday between 9 a.m. and 5 p.m.<br>• One lane in each direction of Powerline Road from north of West Drive to the Palm Beach County line will be closed overnight Sunday through Friday between 8 p.m. and 5 a.m.<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>Description: Project improvements include widening Powerline Road from north of West Drive to the Broward / Palm Beach County Line to accommodate bike lanes and shoulders from north of West Drive to the Broward / Palm Beach County Line, removing old asphalt and resurfacing the roadway, upgrading curbs and ramps to meet ADA standards, installing new pavement markings, installing new street signs, installing pedestrian countdown timers, improving lighting on the west side of Powerline Road just north of Hillsboro Boulevard.<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>Cost/Completion: $3,035,505. Completion in summer 2015.<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>A1A Bridge Rehabilitation Project over the Hillsboro Inlet in Hillsboro Beach<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>Traffic Impact:<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>• North Riverside Drive underneath the bridge is closed for the duration of construction.<br>• The bridge is closed overnight to navigation between 7:30 p.m. and 7:30 a.m. for the duration of the project. Mariners may request an opening during this time by providing a four-hour advance notice to the bridge tender or by calling (954) 943-1847.<br>• The vertical clearance of the bridge will be reduced by 2 feet for the duration of the project.<br>• The north and south side channels will be closed to navigation for the duration of the project because of on-going work in the channels. <br>• The bridge will be closed continuously to all vehicles, bicycles and pedestrians from Wednesday, June 17 to Friday, July 3. For marine traffic information, please refer to the Coast Guard’s Local Notice to Mariners for the Seventh District at http://www.navcen.uscg.gov/?pageName=lnmDistrict®ion=7.<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>Description: The improvements under this contract include removing the existing concrete and replacing the concrete deck; constructing a new sidewalk and pedestrian railing along the south side of the bridge; constructing new traffic railings along both sides of the bridge; upgrading the fender system; restoring existing bridge tender house; installing decorative statue and accent lighting, and removing existing paint with blasting process and re-painting the bridge.<o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>Cost/Completion: $7.8 million. Completion in late 2015. <o:p></o:p></span></p><p><span style='font-size:10.0pt;font-family:"Arial","sans-serif";color:#333333'>Have a great Tuesday,<br>Bill Ganz<o:p></o:p></span></p><p class=MsoNormal><o:p> </o:p></p><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif"'><o:p> </o:p></span></p></div></body></html>